The Project

Krones AG is a world-leading manufacturer of equipment for bottling and packaging beverages and liquid food products, as well as pharmaceutical, cosmetic and chemical products in glass bottles, PET bottles and cans.  

Project: Electrical installations and mechanical assembly of production line for glass and PET bottles.

Place of project implementation: France, Saint-Galmier

france_flag

linia produkcyjna

Electrical installations of machines

The scope of electrical works included the installation of machines and devices on the production line.The machines are described in the mechanical works below.

  • Electrical connection of machines included in the production line
  • Laying cable routes, power and control cables on main routes and along the production line
  • Positioning and assembly of machine control cabinets
  • Electrical connection of machine control cabinets
  • Electrical installation of sensors, cameras, switches, light curtains, operating panels, control and power supply boxes and a number of other elements of the line electrical installation
  • Measurements

Mechanical assembly of machines

The scope of mechanical works at the plant included the assembly of machines for product quality control, rejection of bottles after quality control, glass and PET bottle conveyors, labeling machines, bottling machines, cleaning and cooling machines, capping machines, PET bottle blowing machines and a robotic mold changing system for blowing machines.

  • Positioning and alignment of machines
  • Mechanical assembly of the above-mentioned machines
  • Configuring mechanical functions of machines
  • Documentation of changes

5.5 weeks

duration of mechanical assembly and electrical installation of the line

Benefits for our Partner

We are a regular partner of Krones in electrical and mechanical installations, hence the work is performed with repeatable, high quality

  • Full knowledge of technical issues of the industry and machines

    ensured self-sufficiency and allowed the project to be completed on time, without any unforeseen additional costs

  • Implementation with a reliable partner

    confirmed by the ISO 9001 quality management system certificate (check in the footer)

  • High quality of work performed

    ensured the safety of the production line and minimized the risk of failure

  • Timeliness of work

    the quick launch of the line directly influenced the generation of profits for the client

Talk to an advisor

Send an inquiry or call +48 513 221 627 We will talk for a few minutes about the challenges you face.

    This website uses reCAPTCHA protection. Privacy Policy and Terms of Service.

    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo

    We will be at the Warsaw Industry Week 2025! We look forward to seeing you on 5-7 November

    Check out