The project

Ecophon is a leading supplier of acoustic systems for interior design. The company develops, produces and sells acoustic solutions, wall panels and ceiling systems that contribute to creating a friendly and healthy indoor climate, improving the quality of life and the well-being and efficiency of users. Ecophon is part of one of the hundred largest industrial groups in the world – the Saint-Gobain group. Our cooperation included the implementation of electrical installations for the expansion of the production and warehouse hall, reconstruction of the social and office building and the necessary elements of technical infrastructure.

hala produkcyjno-magazynowa

Scope of project implementation

Electrical installations in industrial plants are required to be constructed with the highest safety standards and to maintain the longest possible service life, which will allow devices and machines to operate for many years without downtime. The scope of work we carried out with the above-mentioned assumptions included:

  • Design and installation of a transformer station
  • Installation of cable routes (at the end of the project, the company supplying the cable trays carried out an audit to prepare a report certifying that our work complies with the highest standards of route execution)
  • Internal power lines
  • Design and assembly of main and facility switchboards (prefabrication in our hall and assembly and connection at the customer’s)
  • Comprehensive electrical installations: basic and emergency lighting, sockets, power supply for electrical, ventilation, air conditioning, heating and sanitary devices
  • Equalization connection installations
  • Earthing installation
  • Surge protection
  • Anti-shock protection

The scope of telecommunications installations included:

  • Installation of the SSP fire alarm system
  • Installation and commissioning of a CCTV system
  • LAN structured cabling system

Additional solutions include lighting automation (DALI system). The hall lighting is controlled by motion sensors and light intensity sensors (adjustment to the amount of sunlight entering). Emergency lighting is equipped with a luminaire monitoring system – you can see their condition and battery status.

Project challenges

The Project Managers, Foremen and Proster Electricians who implemented the project deserve praise. The team was constantly solving challenges that appeared independently of us, which concerned the replacement of a medium-voltage switchgear, where there was a need to quickly respond to the acquisition of replacement materials. Another case was the assembly of a transformer station, where we efficiently connected all the elements thanks to the use of anti-vibration pads. The rest of the work was done without any major problems.

Korzyści dla naszego Partnera

Wybranie naszej firmy na wykonawcę instalacji elektrycznych hali produkcyjnej i magazynowej, dostarczyła firmie Ecophon wymierne korzyści.

  • Elastyczność wobec partnera

    poprzez zwiększenie zasobów na projekcie w kluczowych etapach

  • Szeroki zakres prac u jednego realizatora

    Instalacje elektrotechniczne (w tym oświetleniowe) oraz teletechniczne wykonane przez Proster

  • Terminowość i szybka realizacja prac

    biorąc pod uwagę szeroki zakres i wielkość projektu

  • Wysoka jakość wykonywanych robót

    zapewniła bezpieczeństwo linii produkcyjnej i minimalizuje ryzyko awarii

  • Minimalizacja ryzyka przestojów działania instalacji

    dzięki wysokiej jakości zastosowanych materiałów oraz wysokiej dbałości o jakość prac

  • Realizacja z rzetelnym partnerem

    potwierdzonym certyfikatem systemu zarządzania jakości ISO 9001 (sprawdź w stopce)

Talk to an advisor

Send an inquiry or call +48 513 221 627. We will talk for a few minutes about the challenges you face.

    This website uses reCAPTCHA protection. Privacy Policy and Terms of Service.

    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo