Assembly and Commissioning of Production Line Machinery in Scotland
Project

Krones AG is a global leader in the manufacture and integration of advanced filling and packaging equipment.
Project: Assembly and commissioning of production line machinery in Scotland.
Location: Scotland


Assembly and Installation Works on 3 Lines
We carried out a comprehensive unloading and positioning of all equipment covered by the installation scope in the designated locations on the production hall floor. In the next stage, we performed precise leveling and mutual alignment of the machines, completed all internal electrical connections, and secured the equipment through permanent anchoring to the floor. Further activities included the installation of conveyor systems along with their complete cabling and the mounting of protective guards.
Electrical Installation
The scope of electrical works included the construction of complete cable trays and the laying of power and control cables. We completed power and control system connections for all machines, assembled and commissioned the main electrical distribution boards and control cabinets dedicated to individual devices, as well as other electrical and automation components. The works were finalized with input/output signal checks, a comprehensive inspection of the entire installation together with verification of the technical documentation, and the preparation of documentation for all modifications introduced. List of equipment installed on the lines:
- Pallet unpacking machine
- Depalletizers
- Labeling machine Conveyor systems:
- Pallet conveyors
- Secondary packaging conveyors
Benefits for the Partner
For over 20 years, we have been assembling production lines for Krones, which confirms the high quality of our work and the trust placed in our company.
-
Experience in glass bottle production lines
pozwoliła uniknąć kosztów związanych z opóźnieniami, a szybkie uruchomienie linii bezpośrednio wpłynęło na generowanie zysków dla klienta
-
On-time commissioning
minimalizuje możliwość awarii i przestojów na linii produkcyjnej
-
High quality of workmanship
była kluczowa w realizacji projektu w terminie
-
ISO 9001 certified quality management system
Wykonujemy prace potwierdzone certyfikatem systemu zarządzania jakości ISO 9001 (sprawdź w stopce)