Photovoltaic Installation for Coca-Cola — Photovoltaic Carports
Project

Coca-Cola HBC Polska – one of the world’s most recognized beverage brands, seeking sustainable energy solutions for its production facilities.
Project: Design and installation of a photovoltaic system for a Coca-Cola facility.
Location: Poland

Project Description
The scope of work included the installation of:
- carport structures
- 222 ZN Shine photovoltaic panels
- 2 Huawei inverters
- cable trays
- AC and DC distribution boards
Carport panels are an excellent solution that makes use of parking spaces at production facilities.
Installed capacity
99,8 kW
Estimated annual savings
100MWh / year
Benefits for the Partner
-
Significant reduction in energy costs
szacowana oszczędność to 100MW rocznie
-
Making use of parking space
Photovoltaic carports are a perfect fit for parking areas at production facilities
-
A real contribution to environmental protection
Which is not insignificant in an era when companies are required to prepare ESG reports
-
Guaranteed quality of installation
PROSTER has been carrying out electrical installations in industry since 1985, continuously subjecting its competencies to audit (see the ISO 9001 certificate in the footer)
-
PROSTER warranty and post-warranty service
Ensures a fast response and prompt corrective action in the event of any system failure