Photovoltaic Installation for Coca-Cola — Photovoltaic Carports

Project

coca-cola-polska-logo

Coca-Cola HBC Polska – one of the world’s most recognized beverage brands, seeking sustainable energy solutions for its production facilities.

Project: Design and installation of a photovoltaic system for a Coca-Cola facility.

Location: Poland

fotowoltaika-na-carportach-przy-zakładzie-produkcji

Project Description

The scope of work included the installation of:

  • carport structures
  • 222 ZN Shine photovoltaic panels
  • 2 Huawei inverters
  • cable trays
  • AC and DC distribution boards

Carport panels are an excellent solution that makes use of parking spaces at production facilities.

Installed capacity

99,8 kW

Estimated annual savings

100MWh / year

Benefits for the Partner

  • Significant reduction in energy costs

    szacowana oszczędność to 100MW rocznie

  • Making use of parking space

    Photovoltaic carports are a perfect fit for parking areas at production facilities

  • A real contribution to environmental protection

    Which is not insignificant in an era when companies are required to prepare ESG reports

  • Guaranteed quality of installation

    PROSTER has been carrying out electrical installations in industry since 1985, continuously subjecting its competencies to audit (see the ISO 9001 certificate in the footer)

  • PROSTER warranty and post-warranty service

    Ensures a fast response and prompt corrective action in the event of any system failure

Talk to an advisor

Send your inquiry and we will talk for a few minutes about your needs.

    This website uses reCAPTCHA protection. Privacy Policy and Terms of Service.

    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo
    Logo